Client : BSR – BINH SON REFINING & PETROCHEMICAL LIMITED COMPANY
Work location: SPM location
Water depth: 30m
Offshore time: Aug 2020
Vessel: AHTS Hai Duong 12 and PTSC Ngan Nam Thang Long Ha Noi
Equipment: Air Diving System and Rigging gear
Equipment: Air Diving System and Rigging gear
- Dismantle the CALM Buoy Anchoring system;
- Towing CALM Buoy system to onshore dock and docking;
- Cleaning all marine growth, fouling, strange object,… on buoy body;
- DRY-DOCK OVERHAUL: Perform refurbishment of the CALM Buoy system under full supervision of SBM Vendor;
- Towing buoy to offshore and re-connect the buoy;
- Conduct determining the position coordinates of SPM Center/ 04 piles of PLEM & 12 anchors to make sure the SPM system is installed properly as original design;
- Perform combined test for whole system (including function test, leak test, rotation test, …)