FEATURE PROJECTS

Provision of TBVN FPSO Upper Mooring Chains Replacement Services for CLJOC

Client: CLJOC – Cuu Long Joint Operating Company
Working Location: Su Tu Den field in offshore South East Vietnam
Water Depth: 48m
Offshore Time:
• Phase 1: Preparation work: Aug 2021 – Sept 2021;
• Phase 2: Offshore Upper Mooring Chains Replacement: Oct 2021;
• Phase 3: Dismantle work: Oct 2021 – Nov 2021.
Vessel: OCV – Hai Duong 12 and HCV – Sea Meadow 19
Equipment: 153MT A-frame system, 30MT Hydraulic Winch, WROV Quantum 3 & Rigging Gear […]

FEATURE PROJECTS

BSR SPM – 4TH Turnaround

Client : BSR – BINH SON REFINING & PETROCHEMICAL LIMITED COMPANY
Work location: SPM location
Water depth: 30m
Offshore time: Aug 2020
Vessel: AHTS Hai Duong 12 and PTSC Ngan Nam Thang Long Ha Noi
Equipment: Air Diving System and Rigging gear […]

FEATURE PROJECTS

Engineering And Execution Of Disconnection, Towing And Re-installation Of FPU DH01 At Dai Hung Field, Block 05-1A, Offshore VietNam

Client : PVEP POC
Work location: Dai Hung Field
Water depth: 110m
Offshore time: Jun 2020
Vessel: AHTS Hai Duong 12, AHTS Hai Duong 79 and AHTS TC Fortune
Equipment: ROV Quantum 3 and Rigging gear […]

FEATURE PROJECTS

Engineering And Execution Of Disconnection, Towing And Re-installation Of Calm Buoy At Dai Hung Field, Block 05-1A, Offshore VietNam

Client : PVEP POC
Work location: Dai Hung Field
Water depth: 110m
Offshore time: Jun 2020
Vessel: AHTS Hai Duong 12 and AHTS PTSC Thai Binh
Equipment: ROV Quantum 3 and Rigging gear […]

FEATURE PROJECTS

Provision Of Engineering And Execution Of Plugging And Abandonment Of DH-1P, DH-2P, DH-3P Well

As per Lumpsum Contract between PVEP POC & TOS, TOS used to TOS Ha Long for plug & abandonment of DH-1P, DH-2P, DH-3P well.
TOS Ha Long was towed at 10:30hrs, July 16th 2020 from PVC-MS Port and arrived the DH-1P location at 08:30hrs July 18th 2020. The P&A operation was completed at 09:00hrs 21st November, 2020. […]