Work location: SV DN Field
Water depth: 120m
Offshore time: August 2020
Equipment: Quantum 3
Vessel: Barge PTSC OFFSHORE 01
Project SOW:
- Support for piling 09 anchor pipe for FPSO at the water depth 120m.
- Laydown 09 anchor chains.
Work location: SV DN Field
Water depth: 120m
Offshore time: August 2020
Equipment: Quantum 3
Vessel: Barge PTSC OFFSHORE 01
Project SOW:
Copyright © 2022 Thien Nam Offshore Services JSC